Case Study -
Fast and Environmentally Effective Modular Building Installation for Argent Energy

Published: May 19th 2017
Client:

Argent Energy

Build Size:

Sector:

Commercial

Product:

Modular BuildingsPortable CabinsTwo-Storey Portable Buildings

Lead Time:

4 Weeks

Overview

Argent Energy has pioneered the large scale commercial production of biodiesel in the UK producing sustainable transport fuels from waste fats, oils and grease that would otherwise go to landfill or can block up sewers. With the government’s renewable transport fuel obligation requiring major oil companies to include some low carbon renewable fuels mixed in to regular petrol and diesel, the demand for its clean, green fuel is growing amongst transport companies and road hauliers.

Meeting this demand a £75m biodiesel fuel production facility at Stanlow opened in 2016 complementing an existing production site in Motherwell. Complementing the production side of the business is the Argent Oil Terminal in Ellesmere Port which oversees the storage and distribution of bio-diesel to customers across the UK.

As part of a recent £18M Tank farm and Biomass project, Argent needed to upgrade the existing control room at the Ellesmere Port facility due to increasing sales volumes and to allow for future growth. The most practical option was a modular building that could be installed and quickly made fully operational to minimise site disruption.

Joe Warburton, Maintenance & Project Manager for Argent Oil Terminal comments, “Price and quality were the key criteria and Springfield’s response to the tender was by far the best on both counts. In just ten days the two storey complex was installed and commissioned and the teams worked really well, to the point where we’re already talking to Springfield about a second project.”

Key issues faced by Argent Oil Termional

  • New facility needed to house IT and radar equipment
  • Modular building needed to minimise site disruption and offered a more environmentally effective solution than a traditional build
  • Two storey building needed to be ready to use and complete with air-conditioning for sensitive electrical equipment
  • Price and quality were major considerations in selecting a supplier

What Springfield did

Once the specification for the £160 000 project was agreed Springfield built and finished the eight modular units on site prior to delivery.  The ground works and installation of the two storey control unit and utilities connection took just ten days.   

Lyndsey Duggan, Springfield’s Managing Director adds, “Argent’s environmental credentials are impeccable which makes a modular building a perfect solution for them.  Coupled with the business case in terms cost, speed of installation and ease of expansion it’s clear to see that Argent Energy will play an important role in helping reduce carbon emissions on the roads.”

Summary and key benefits

Springfield built, delivered and commissioned the two storey build on time and within budget allowing Argent to rapidly switch over the operational control of storing, blending and distributing its bio-diesel fuel to customers across the UK – including to over 3000 vehicles in London to help reduce particulate emissions.

Price and quality were the key criteria and Springfield’s response to the tender was by far the best on both counts. In just ten days the two storey complex was installed and commissioned and the teams worked really well, to the point where we’re already talking to Springfield about a second project.
Joe Warburton

Related Case Studies


  • Holy Trinity RC Primary School, Salford

    Sector:

    Product: Holy Trinty RC School required more space for a growing intake and an existing modular classroom needed replacing to create the space. The school were keen to accept as much help as they could get with the project and were delighted when we offered a full turn-key package taking care of all building regulations, groundworks, and all utility connections along with the demolition and removal of the existing building.

    Read More

  • Cormar Carpets, Holme Mill, Ramsbottom, Lancashire

    Sector:

    Product: Cormar Carpets wanted to improve the welfare facilities for their employees and required a bespoke solution. We created a 4-bay, 12M x 12M modular building with staff lockers and full kitchen facilities.

    Read More

  • Gregson Lane Community Centre, Hoghton, Preston

    Sector:

    Product: Gregson Lane Community Centre, based in Hoghton, Preston, required a 12M x 21M, 7-bay modular building to accommodate various daily activities. This large-scale build is fully air-conditioned and features a kitchen, bar, toilets, storeroom and cricket club changing facilities.

    Read More

See how our portable buildings could benefit you

Contact our friendly team for more information on our full range of buildings and how to start the process of hiring or buying a modular building for your business. Our expert team is always available to give advice, guidance or support.

50 years experience
Industry experts
High quality at great value
Made in the UK
Sustainable buildings
Locally sustainable products
Bespoke buildings
Tailored portable units

Get in Touch



    [utm_source_i][/utm_source_i]
    [utm_medium_i][/utm_medium_i]
    [utm_campaign_i][/utm_campaign_i]
    [utm_term_i][/utm_term_i]
    [utm_content_i][/utm_content_i]

    Speak directly with one of our design team who will answer any questions you have and guide you through the wide range of choices available

    Call Now 01744 851958